
Welcome to the Valley County Building Department Frequently Asked Questions page. Please visit our Application Instructions pdf for more, important details, and information. Or contact our office with further questions and for assistance.
Please Be Advised
We are not accepting permit applications electronically until December 1st, 2026. Until then please mail in your paper permit plans and applications or drop them off at our office in Cascade.
The date we will go live with the electronic applications on December 1st, 2026. The link will be available on our Valley County Building Department webpage in the menu or use the green shortcut button.
Create your account. Our application wizard will lead you through our application on-line form. Drag and drop your plans engineering and site plan to upload, sign and submit.
Applying might be easier than ever. Feel welcome to reach out to our Building Department staff if you need any assistance.
Additionally, you'll be able to print our approved job set of building plans from the digital file, schedule inspections, make payments, create project names to organize your applications/permits, or chat with our staff during business hours right from your permit workspace.
You can upload documents and plans in a variety of common file formats, including:
All of the application requirements remain the same. Same supporting documents are required, same owner signature, same design criteria.
To accept your application, we must have your: site plan, engineering, building plans and owner signature. Please refer to the application instructions or contact our Building Department staff for assistance.
Does this mean I can start construction? NO
As soon as you submit your application, the review process will begin. The system automatically assigns a building permit number but your building permit is not approved or issued until fully signed off, plans are reviewed, and the fee is paid. When your permit is ready to issue, you'll receive an email with your fees due. Once paid, a permit package will be emailed to you with all the documents for your permit. Please print out a full-size set of plans for your job site and post your building permit. Construction cannot commence until the approved set of plans and building permit are on site.
Please print out the approved building plans from your building permit package once your permit is issued. Plans must be full size (at least 18 x 24"). Don't forget to print out your engineering calculations too.
It is possible to fail an inspection if the job site copy of your plans is not available when the inspector arrives on site.
If your building permit was issued before our new on-line system, please contact us. We'll create a workspace for your permit you can use to request inspections, make changes, and print your approved set of plans and engineering. Prior inspections won't be visible but the ones you schedule after December 1, 2026 will be available to view on-line.
We are working to add existing permits. If you are wanting your permit to be added sooner than later, feel welcome to contact us and we'll see what we can do. When you call in your inspection requests for existing permits, expect an email from us with a link inviting you to collaborate.
If your building permit status is Permit issued or Construction started, make changes to your plans by completing the change form, attaching clouded plan pages and providing a letter from your engineer saying that the original calcs haven't changed (or if they have, please provide the engineers change calcs). Fees are determined at plan review and start at $50. If you turn in a full new set of plans, a full plan review fee may be billed.
Changes to plans should be approved BEFORE you construct the changes. Which means you must build according to the approved set of building plans until your changes are approved by the Building Official. Changes constructed before approval may incur violation fees and fail an inspection.
Your permit number will remain the same. Please print out the approved changes to your plans and attach them to your job copy of the building plans on the job site.
To find the change form please log in and open your building permit workspace (if your older permit is not set up yet, please contact the Building Dept to add it for you). In the top right corner, click on Options and then Apply for Plans resubmission. Describe your change, upload your attachments, submit (owner signature is required). We'll process your changes as soon as possible but please plan on about 4-5 business days.
A building permit is required to construct, enlarge, alter, repair, move, demolish or change the occupancy of a building or structure, the installation of which is regulated by code, or to cause any such work to be performed, shall first make application to the Building Official and obtain the required permit. See International Residential Code § R105.1
Valley County Building Department serves all of unincorporated Valley County except for the City Impact Areas of McCall, Donnelly, and Cascade. The simplest way to tell if you are in one of the impact areas is to look at your building site's parcel number. If your parcel number begins with RPM, RPD, or RPC you should contact your City for a building permit. If your parcel number starts with RP then building permits are in the jurisdiction of Valley County.
Plans must be at least 18x24" and not larger than 24x36"
Starting December 1st, we will begin electronic building permit applications and you can upload your building plans instead of printing.
Yes, starting December 1, 2026!
Please visit our Valley County Building Department website for the link to our on-line application.
It takes approximately 2-8 weeks to process your building permit application, depending on how busy we are. Usually, from May-October we are very busy.
Your plans and engineering calculations should show the correct design criteria for Valley as follows:
Roof Snow Load: determined by address, please contact the Valley County Building Department by phone or email.
Wind: 115 mph, Category C
Seismic: Design Category D
Frost Depth: 24"
Climate Zone: 6
Currently, our governing code is 2018 IECC, 2018 IBC, 2018 IRC
To find the Roof Snow Load for your building site, please contact the Building Department at (208) 382-7114 or email us at building@valleycountyid.gov
We only permit wood stove inserts. If you have a free-standing wood or pellet stove, or a gas fireplace, you will want to contact the State of Idaho Division of Occupation and Professional Licenses for a permit. We only permit wood stove inserts and zero clearance wood or pellet stove inserts.
To apply before December 1st, please contact the Valley County Building Department Staff by email.
To apply after December 1st, please use our convenient electronic application. You will be able to find the building permit application link on our Valley County Building Department website. Follow the prompts in the wizard.
We only permit wood stove inserts. If you have a free-standing wood or pellet stove, or a gas fireplace, you will want to contact the State of Idaho Division of Occupation and Professional Licenses for a permit. We only permit wood stove inserts and zero clearance wood or pellet stove inserts.
Before December 1, 2026, please email our staff at building@valleycountyid.gov for instructions.
After December 1, 2026, please start your application in our new online portal. The application wizard will guide you and when you get to the classification screen, choose Residential, choose the type of work, and choose Fireplace Wood Stove Insert for the target. Please upload your installation manual before submitting.
There are two inspections required for Wood Stove Insert Permits. Please coordinate with the contractor to schedule the rough-in and final inspections for your wood stove insert the same day as the rough-in and final for the house on new construction. Please call (208) 382-7114 to schedule your rough-in inspection and your final inspection, at least 24 hours in advance. Please have the Wood Stove Insert Installer's Checklist completed and on-site for your inspection.
A yurt requires a permit similar to a house. Both the yurt and its platform must be engineered to meet Valley County's ordinance requirements for roof snow load, wind, seismic and frost depth.
Yes. Here is a printable information sheet. Yurt Requirements pdf
No, geotechnical reports are not required to support your building permit application for residential construction. However, there are three subdivisions for which there are recommendations or requirements: Boulder Creek Meadows, Fir Grove, and Crane Shores.
Yes. Any structure over 3 feet tall requires a permit in Valley County. Please contact Planning and Zoning Department to pay your placement fee for a storage shed, conex, or other smaller utility building. Shops, Garages, Tiny Homes will require a full building permit. See instructions.
Please contact Planning and Zoning department to permit your storage shed, conex or other utility building or for a placement fee. (208) 382-7115
This would be permitted as a garage. Please see our Application Instructions for a full list of requirements.
Please see the attached checklist for your manufactured home building permit application. Use this link for to print your building permit application form.
The set fee for a single wide is $150 + $50 for each additional section. If a concrete foundation is used, concrete fee is per the square foot of foundation. A 35% plan review fee is 35% of the concrete fee.
Please contact the State of Idaho DOPL for information on rehabilitation requirements for mobile homes built before 1976.
Snow roofs are only required if the manufactured home does not meet the roof snow load for the address where you are placing the manufactured home. Snow roofs require a separate permit and the manufactured home cannot be occupied until both the snow roof and manufactured home have passed their final inspections.
To find the roof snow load for your building site, please call the Valley County Building Department at (208) 382-7114 or email building@valleycountyid.gov
Approach permits are required for new driveways with approaches from public roads in Valley County. Please contact the Valley County Road Department at (208) 382-7195
Even if your driveway is already existing, you will still need something in writing from the Valley County Road Department to support your building permit application. Please print out your approval and bring it in with you when you come to pick up your building permit.
If your new driveway is 150 feet or longer, please contact your local fire department for a letter of approval to submit with your building permit application.
If your job site address is not in a fire district, no letter is required. Please be sure your driveway meets the requirements of the International Fire Code.